Projects in Tanzania

The projects comprised the works on five hydroelectric power plants throughout Tanzania.

As the bearer of the mechanical engineering part of the works, along with a minor number of subcontractors, MG Servis has successfully completed all the planned works (refurbishment of the drainage and dewatering system, replacement of the cooling system, replacement of turbine regulation components, inspections of MIV, etc.). During the project, the overhauls of hydro generators at HPP Mtera were also carried out.

No. Structure Customer Power Voltage (V) Manufacturer Description
(kVA,kW)
2017.
408 HE Nyumba Ya Mungu Telenerg d.o.o. 4700 11000 B.P.L. General overhaul of Unit 1 and inspection overhaul Unit 2
2015.
407 HE Mtera Telenerg d.o.o. 45000 10500 ABB General overhaul of Unit 1
406 HE Kidatu Telenerg d.o.o. 52500 11000 Končar Supply and installation of cooling system of generator no. 1
2014.
405 HE Kidatu Telenerg d.o.o. 52500 11000 Končar Equipment supply and cooling system reconstruction
  HE Mtera Telenerg d.o.o. 40000 11000 BBC Equipment supply and general overhaul of generator
  HE New Pangani Falls Telenerg d.o.o. 40000 11000 ABB MIV supply and rehabilitation
  HE Nyumba ya Mungu Telenerg d.o.o. 4700 11000 B.P.L. Equipment supply and MIV rehabilitation, el. test
  HE Kihansi Telenerg d.o.o. 70000 11000 ABB Equipment supply and installation, MIV installation
2012.
350 Hidro gen. HE MTERA Tanz.  45000  10500  BBC Generator stator repair

IMG 4854IMG 1215IMG 1214IMG 0645fotografija